| Corporate Profile: Brazilian Gold Corp Publisher: Kaiser Research Online Author: Copyright 2010 John A. Kaiser
|
|
Brazilian Gold Corp (BGC-V)
Brazilian Gold Corp changed its name from Red Dragon Resources on January 6, 2010, reflecting the company's move into Brazil that took place during the second half of 2009. Led by CEO Ian Stalker and President Joanne Yan, the company has a 51% interest in the Boa Vista gold project optioned from a subsidary of Majestic Diamonds & Metals, and an 80% option on the Maues Gold project, both in the Tapajos region. The company also has a 50% interest in the Rea uranium project in the Saskatchewan Basin where Uramin is vesting for 50%. Subsequent to its move to Brazil, the company has since expanded its property portfolio by acquiring a number of early-stage gold prospects, primarily in Para State. In September 2013 Brazilian Gold agreed to be acquired by Brazil Resources, with BGC shareholders receiving 0.172 BRI shares per BGC share, around a $13.5 million valuation. |
Key to Understanding IPV Charts and Spec Value Hunter Tables
An IPV Chart is a graphical presentation of a Spec Value Hunter table that has been constructed according to the Rational Speculation Model developed by John Kaiser. The IPV Chart allows speculators to identify which projects offer poor, fair or good speculative value in both absolute and relative terms. The speculative value depends on the project stage, the project's implied value as calculated by the company's fully diluted capitalization, stock price and net project interest, and the dream target deemed appropriate for the project. A dream target is what a project would be worth in discounted cash flow terms once in production. |
Green background indicates the dream target judged appropriate for this play by John Kaiser - otherwise unranked. |
Poor Speculative Value - |
Fair Speculative Value - |
Good Speculative Value - |
Note: narrow arrows indicate IPV is outside the fair value channel but within 25% of the fair value limits |
Click on the company name to view the company profile, the project name to view project details. |
Click on the project icon if its background is shaded to get the IPV Chart for that company. |
Sao Jorge | | 100% WI | Brazil | 5-PEA |
---|
Sao Jorge 43-101 Economic Study (USD except where noted otherwise) |
PEA | Jun 21, 2011 |
| Coffey Mining | Sao Jorge |
Mining Scenario | TR | Mining Costs |
Mining Type: | OP |
| Cost Currency: | USD |
Processing Type: |
|
| Capital Cost: | $113,834,558 |
Operating Rate: | 5,500 tpd |
| Sustaining Cost: | $12,381,509 |
Operating Days: | 300 |
| Operating Cost: | $16.36/t |
Strip Rate: | 4.5 |
| BC Cash Cost per Unit: USD | $510/oz Au |
Mine Life: | 8 years |
| BC Cash Cost Net By-Products: USD | $510/oz Au |
LOM Tonnage: | 15,615,000 t |
| BC All-In Cost Net By-Prod: USD | $812/oz Au |
Est Startup: |
|
| Spot All-In Cost Net By-Prod: USD | $812/oz Au |
Production Potential |
| Metal 1 | Metal 2 | Metal 3 | Metal 4 |
Metal: | Au |
|
|
|
Grade: | 0.93 g/t |
|
|
|
Recovery: | 91.0% |
|
|
|
Annual Output: | 52,900 oz |
|
|
|
LOM Output: | 418,473 oz |
|
|
|
Base Case Price: | $1,300/oz |
|
|
|
Spot Price: | $1,315/oz |
|
|
|
Base Case NSR: | $41.68/t |
|
|
|
Spot NSR: | $42.16/t |
|
|
|
Base Case Valuation |
Reported Valuation Currency: | USD |
| Pre-Tax NPV: | $99,100,000 |
Discount Rate: | 5% |
| After-Tax NPV: |
|
Total Base Case NSR USD: | $41.68/t |
| Pre-Tax IRR: | 23% |
Total Spot NSR USD: | $42.16/t |
| After-Tax IRR: |
|
Annual Pre-Tax Cash Flow Base Case and Net CF/FDSH USD: | $41,776,000 | $0.35 | Pre-Tax Payback: | 3.0 y |
Annual Pre-Tax Cash Flow Spot and Net CF/FDSH USD: | $42,572,145 | $0.36 | After-Tax Payback: |
|
Enterprise Value CAD : | $11,225,436 | $.10/sh | Share Price: | $0.11 |
Note: 2.3$ NSR |
Comparative Valuations using Life of Mine Averages |
Discount Rate: | 0% | 5% | 10% | 15% |
Base Case Pre-Tax NPV USD: | $207,991,933 | $139,209,121 | $91,618,649 | $57,985,051 |
Base Case Pre-Tax Net NPV/Sh USD: | $1.83 | $1.22 | $0.81 | $0.51 |
Premium BC PT NPV over EV: | $1.75 | $1.15 | $0.73 | $0.43 |
Spot Pre-Tax NPV USD: | $214,361,093 | $144,109,745 | $95,479,899 | $61,091,624 |
Spot Pre-Tax Net NPV/Sh: | $1.89 | $1.27 | $0.84 | $0.54 |
Premium Spot PT NPV over EV USD: | $1.81 | $1.19 | $0.76 | $0.46 |
The comparative NPV calculations assume constant annual cash flow based on the life of mine average annual payable production and CapEx spent in year one. The operating cost includes the LOM sustaining capital. Due to details such as ore scheduling these NPV figures may differ from those of the 43-101 economic study. |