Goldquest Mining Corp (GQC-V)

TSCRSSearchWeb SiteTreeForumSEDARQuoteIPV
Open Recommendation: see Status - Members Only
Trade DateVolumeHighLowCloseChgStatus
December 11, 2017107,700$0.29$0.28$0.28$0.00Trading
Basic Info
Listed On:TSX Venture: GQC7/12/2004Sector:ResourceKey People
Issued:254,057,3849/30/2017Story Type:Dominican Copper-Gold PlayWilliam J. Fisher (CEO), Paul Robertson (CFO), Jeremy Niemi (VP EX)
Diluted:290,154,391
JK Owns:No
Insider Stake:33%6/19/2017Tel:(416) 583-5606
Working Capital:$23,220,8189/30/2017Email:Address
Market Cap:$71,136,068
Web Site:goldquestcorp.com133 Richmond Street West, Suite 501, Toronto, ON, M5H 2L3, Canada
Cash Breakup:$0.09per shTwitter:
Ranking within Company's Price Range based Group
All KRO as of Dec 11, 2017Group MedianCompanyPercentileScore
Price Range:$0.20-$0.29Issued:54,192,160254,057,3847.3%53.0%
Price Group Total:150Working Cap:$588,482$23,220,81898.7%
TSXV KRO as of Dec 11, 2017Group MedianCompanyPercentileScore
Price Range:$0.20-$0.29Issued:49,465,710254,057,3843.7%51.9%
Price Group Total:134Working Cap:$514,620$23,220,818100.0%
Group figures exclude delisted and suspended companies. The higher the company percentile the better, based on the assumptions that the lowest issued shares and highest working capital are best. The score is the average of the percentiles. A percentile is that percentage of a group that a member ranks higher than. Note that issued and WC reflect latest financials.
History of Past Recommendations
Edition Date Price
Recommendation Gain
BF2014 1/3/2014 $0.29 New BF Buy $0.20-$0.29 -2%
BF2014 12/31/2015 $0.15 BF Technical Closeout 100% -48%
Charts & Financing Activity

 Most recent 43-101 resource estimate  Prior resource estimate  PEA  PFS  FS/BFS/DFS
Private Placement Key
less than $500,000 $1,000,000 - $2,000,000 $5,000,000 - $10,000,000 $20,000,000 - $50,000,000
$500,000 - $1,000,000 $2,000,000 - $5,000,000 $10,000,000 - $20,000,000 over $50,000,000
Private placement financing dates and value ranges are based on transactions reported by the TSXV Monthly Review.
Date Company Type Quantity Price FT Units Amount Broker
Aug 13, 2004 GoldQuest Mining Corp PP 2,150,000 $0.400
Units $860,000
Aug 22, 2005 Goldquest Mining Corp PP 10,500,000 $0.200
Units $2,100,000
Feb 15, 2007 Goldquest Mining Corp PP 3,947,340 $0.300
Units $1,184,202
Mar 30, 2010 GoldQuest Mining Corp PP 5,940,000 $0.125
Units $742,500
Mar 30, 2010 GoldQuest Mining Corp PP 1,665,000 $0.125
Units $208,125
Apr 8, 2010 GoldQuest Mining Corp PP 6,644,800 $0.125
Units $830,600
Apr 19, 2010 GoldQuest Mining Corp PP 7,251,000 $0.125
Units $906,375
Mar 6, 2012 GoldQuest Mining Corp PP 6,600,000 $0.100
Units $660,000
Jun 25, 2012 GoldQuest Mining Corp PP 14,605,000 $0.450

$6,572,250
Aug 31, 2012 GoldQuest Mining Corp PP 12,000,000 $1.250

$15,000,000
Nov 13, 2015 GoldQuest Mining Corp PP 31,727,181 $0.110
Units $3,489,990
Apr 8, 2016 Goldquest Mining Corp PP 14,710,000 $0.200

$2,942,000
Jun 22, 2016 Goldquest Mining Corp PP 17,968,750 $0.320

$5,750,000
Mar 9, 2017 Goldquest Mining Corp PP 38,100,000 $0.600

$22,860,000
Capital
Financials Dated: September 30, 2017 Reporting Period: 9 months Year End: 12/31 Currency: CAD
Assets Liabilities Income
Cash Equivalents: $23,871,212 Current Liabilities: $830,296 Operating Revenues: $0
Receivables etc: $179,902 Tangible LT Debt: $0 Operating Cash Costs: $0
Current Assets: $24,051,114 Intangible LT Debt: $0 Operating Cash Flow: $0
Long Term Assets:$1,408,697Total Liabilities:$830,296Operating Non-Cash Costs:$0




Miscellaneous Revenue:$0
Total Assets: $25,459,811 Share Capital: $72,123,284 Cash Expenses: $5,620,698


Shareholder Deficit: ($47,493,769) Non-Cash Expenses: $2,895,333
Working Capital: $23,220,818 Net Shareholder Equity: $24,629,515 Total Expenses: $8,516,031




Overall Cash Flow:($5,620,698)
Monthly Overhead:$624,522

Net Income (Loss):($8,516,031)

Note:
Structure & People
Directors, Officers and Employees: 4,585,000 1.8% AGM: June 19, 2017
Other Insiders: 78,537,410 30.9% People Tree Available
Past Reported Shareholders: 17,343,524 N/A
Related Party Occupation Related
Since
Insider Director Officer Capacity Ownership %
Frank Balint Mining Executive 5/22/2013

500,000 0.2%
Julio Espaillat Geologist 2/8/2011

360,000 0.1%
William J. Fisher Geologist 7/5/2010 CEO 1,625,000 0.6%
Patrick Michaels Fund Manager 6/30/2011

950,000 0.4%
Florian Siegfried Fund Manager 6/30/2011

1,150,000 0.5%
Agnico-Eagle Mines Ltd Public Company 6/19/2017


38,100,000 15.0%
Georges Boisse
4/18/2017
Advisory Board 0 0.0%
David Massola
10/13/2016
VP Corp Dev 0 0.0%
Robert R. McEwen Mining Executive 6/16/2016


20,090,910 7.9%
Jeremy Niemi Geologist 5/14/2014
VP Exploration 0 0.0%
Paul Robertson Accountant 1/1/2010
CFO 0 0.0%
Rosseau Asset Management Ltd Institution 1/1/2013


20,346,500 8.0%
Past Insiders and Reported Shareholders - Current Ownership Status unknown
Related Party Occupation Related
Since
Insider
Ended
Director
Ended

Capacity Ownership
Batell Investments Ltd Broker 4/8/2010


Placee 50,000
June Brooks Broker 3/30/2010


Placee 30,000
Martin Burian Broker 3/6/2012


Placee 150,000
Roger Davey Engineer 6/1/2004 6/29/2012 6/29/2012
Director 240,000
David B. Elliott Broker 4/8/2010


Placee 200,000
Lynford Evans Broker 3/6/2012


Placee 50,000
Jane Feng Broker 3/30/2010


Placee 40,000
Thomas Gallant Broker 8/31/2012


Placee 20,000
Gold Fields Ltd
8/10/2009


Placee 8,600,000
Michael Gray Broker 3/30/2010


Placee 80,000
David Hall
5/31/2004 7/6/2009 7/6/2009
Director 57,000
Alexandre N. Heath Broker 4/8/2010


Placee 40,000
Leanna Jiang Broker 3/30/2010


Placee 300,000
Alykhan Jiwa Broker 3/30/2010


Placee 100,000
James Kelleher Lawyer 6/1/2004 5/27/2009 5/27/2009
Director 0
Chester Kmiec Broker 3/6/2012


Placee 150,000
Desiree Kranendijk Broker 4/8/2010


Placee 40,000
Rick Langer Broker 4/8/2010


Placee 100,000
Daniel Maarsman Jr Broker 3/30/2010


Placee 100,000
Nancy Maarsman Broker 3/30/2010


Placee 100,000
Neil MacDonald
3/4/2007


Director 50,000
Douglas McDonald Broker 4/8/2010


Placee 40,000
Tyler Milne Broker 8/31/2012


Placee 40,000
Minmet plc




Insider 5,594,857
Shari Ventures Broker 4/8/2010


Placee 80,000
Kerry D. Smith Analyst 4/8/2010


Placee 300,000
Anna Stylianides Lawyer 7/6/2009
6/30/2011
Director 0
Chris Theodoropoulos Lawyer 12/1/2005 6/22/2007 6/22/2007
Director 0
Trafalgar Universal Limited
4/8/2010


Placee 50,000
Alistair Waddell Geologist 6/22/2007
6/30/2011
Director 266,667
Anthony Warrender
5/1/2005
6/30/2011
Director 0
John Willett Broker 3/30/2010


Placee 400,000
Andrew Williams Broker 4/8/2010


Placee 75,000
Share positions of current insiders based on last AGM circular, ownership % based on current Issued. Share positions of past insiders and shareholders have not been adjusted for rollbacks or splits.
Active Index Memberships
Membership Start Date:December 31, 2015Start Price:$0.15
KRO 2016-18 Bottom-Fish Index:
Membership Start Date:December 30, 2016Start Price:$0.27
KRO 2017-18 Spec Value Hunter Index:
Risk Analysis

Click here to view IPV Report

Key to Understanding the Spec Value Hunter Tables
Flagship Play Secondary Plays Other Plays
A Spec Value Hunter table allows speculators to identify which projects offer poor, fair or good speculative value according to the rational speculation model. The speculative value depends on the project stage, the project's implied value as calculated by the company's fully diluted, stock price and net project interest, and the dream target deemed appropriate for the project. A dream target is what a project would be worth in discounted cash flow terms once in production.
Poor Speculative Value - Fair Speculative Value - Good Speculative Value -
Note: narrow arrows indicate IPV is outside the fair value channel but within 25% of the fair value limits
Active Company Projects
ProjectCountryRegionNet
Interest
StageIPV $
MM

$100
UPV
$500

$2000
Target MetalsDeposit Style
RomeroDominican RepublicDominican Republic100% WI6-Prefeasibility $81 Gold CopperEpithermal
Cerro DoradoDominican RepublicDominican Republic80% WI2-Target Drilling $102 Gold CopperIntrusive
Las AnimasDominican RepublicOther100% WI4-Infill & Metallurgy $81 Copper Gold Silver Zinc
TireoDominican RepublicOther100% WI2-Target Drilling $81 Gold CopperPorphyry
Company Projects

Romero Project
Share Collective Boomtown
RomeroDominican Republic
Dominican Republic3,997 ha
Net Interest: 100% WI
Vested: Yes
Uncapped NSR/GOR: 1.25%
Ownership Terms: Also called La Escandalosa. Gold Fields was earning a 60% interest by spending $5 million over 3 years. Goldquest reacquired 100% in August 2009 by issuing 8.6 million shares and granting a 1.25% NSR.
Target Metals: Gold CopperModel: EpithermalStage: 6-Prefeasibility
Milestone Timeline
ProgramStartEndMilestone
Delineation2012 Q3 Mid September2012 Q3 Mid SeptemberDrilling begins with larger drill capable of drilling to 700 meters that will allow the drilling of deeper holes below existing holes that ended in mineralization and of angled infill holes in areas of known mineralization.
Delineation2013 Q1 Mid February2013 Q1 Mid February30,000m drill program begins.
Economic Study - PEA2014 Q2 April2014 Q2 AprilPEA expected to be completed.
Target Testing2014 Q2 Early May2014 Q2 Early May10,000m drill program to begin, to focus on the Tireo project concessions, with the intention of identifying new mineralized bodies which could increase the mineral resources in the Romero project area.
Base Case Resource Estimates
Project Resource Estimate - Las Tres Palmas
Oct 29, 2013NI 43-101B.T. Hennessey, Micon InternationalCutoff:
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources19,420,000$158/tGold2.63 g/t100.0%1,642,112 oz67%
Copper0.630%100.0%269,724,006 lb26%
Zinc0.290%100.0%124,158,669 lb6%
Silver3.70 g/t100.0%2,310,195 oz1%
Inferred Mineral Resources10,020,000$104/tGold1.64 g/t100.0%528,335 oz63%
Copper0.360%100.0%79,524,335 lb23%
Zinc0.420%100.0%92,778,391 lb12%
Silver3.80 g/t100.0%1,224,191 oz2%
All Categories Spot29,440,000$139/tGold2.29 g/t
2,170,447 oz66%
Copper0.538%
349,248,342 lb25%
Zinc0.334%
216,937,061 lb7%
Silver3.73 g/t
3,534,386 oz1%
Spot Gross Metal ValueMarket Cap as % of Net GMVSpot Prices Used
$4,103,818,9112.0%Gold $1,247.15/oz, Copper $2.97/lb, Zinc $1.40/lb, Silver $15.84/oz
Romero 43-101 Economic Study (USD except where noted otherwise)
PEAApr 29, 2015
JDS Energy & Mining IncRomero
Mining ScenarioTRMining Costs
Mining Type:UG
Cost Currency:USD
Processing Type:

Capital Cost:$143,000,000
Operating Rate:2,314 tpd
Sustaining Cost:$92,000,000
Operating Days:365
Operating Cost:$52.78/t
Strip Rate:0.0
BC Cash Cost per Unit: USD$565/oz Au
Mine Life:9 years
BC Cash Cost Net By-Products: USD$50.63/oz Au
LOM Tonnage:7,700,000 t
BC All-In Cost Net By-Prod: USD$374/oz Au
Est Startup:

Spot All-In Cost Net By-Prod: USD$363/oz Au
Production Potential

Metal 1Metal 2Metal 3Metal 4
Metal:AuCuAg
Grade:4.02 g/t0.81%4.25 g/t
Recovery:75.0%96.8%49.8%
Annual Output:78,913 oz13,804,348 lb32,391 oz
LOM Output:726,000 oz127,000,000 lb298,000 oz
Base Case Price:$1,225/oz$2.90/lb$17.00/oz
Spot Price:$1,247/oz$2.97/lb$15.84/oz
Base Case NSR:$114.45/t$47.40/t$0.65/t
Spot NSR:$116.52/t$48.54/t$0.61/t
Base Case Valuation
Reported Valuation Currency:USD
Pre-Tax NPV:$355,000,000
Discount Rate:6%
After-Tax NPV:$219,000,000
Total Base Case NSR USD:$162.50/t
Pre-Tax IRR:46%
Total Spot NSR USD:$165.67/t
After-Tax IRR:34%
Annual Pre-Tax Cash Flow Base Case and Net CF/FDSH USD:$92,673,165$0.28Pre-Tax Payback:2.3 y
Annual Pre-Tax Cash Flow Spot and Net CF/FDSH USD:$95,349,657$0.29After-Tax Payback:2.7 y
Enterprise Value CAD :$58,202,313$.20/shShare Price:$0.28
Note:
Comparative Valuations using Life of Mine Averages
Discount Rate:0%5%10%15%
Base Case Pre-Tax NPV USD:$599,058,489$421,949,144$301,669,950$217,757,908
Base Case Pre-Tax Net NPV/Sh USD:$2.06$1.45$1.04$0.75
Premium BC PT NPV over EV:$1.91$1.30$0.88$0.59
Spot Pre-Tax NPV USD:$623,146,915$440,067,264$315,682,659$228,863,217
Spot Pre-Tax Net NPV/Sh:$2.15$1.52$1.09$0.79
Premium Spot PT NPV over EV USD:$1.99$1.36$0.93$0.63
The comparative NPV calculations assume constant annual cash flow based on the life of mine average annual payable production and CapEx spent in year one. The operating cost includes the LOM sustaining capital. Due to details such as ore scheduling these NPV figures may differ from those of the 43-101 economic study.
After-Tax Valuations using Spot By-Product Prices
Romero 43-101 Economic Study (USD except where noted otherwise)
PEAMay 27, 2014
Micon Intl.Romero
Mining ScenarioTRMining Costs
Mining Type:UG
Cost Currency:USD
Processing Type:

Capital Cost:$333,500,000
Operating Rate:3,800 tpd
Sustaining Cost:$40,400,000
Operating Days:365
Operating Cost:$58.69/t
Strip Rate:

BC Cash Cost per Unit: USD$969/oz Au
Mine Life:15 years
BC Cash Cost Net By-Products: USD$366/oz Au
LOM Tonnage:18,500,000 t
BC All-In Cost Net By-Prod: USD$662/oz Au
Est Startup:

Spot All-In Cost Net By-Prod: USD$714/oz Au
Production Potential

Metal 1Metal 2Metal 3Metal 4
Metal:AuCu

Grade:2.69 g/t0.61%

Recovery:79.2%86.5%

Annual Output:84,000 oz15,600,000 lb

LOM Output:1,260,000 oz234,000,000 lb

Base Case Price:$1,300/oz$3.25/lb

Spot Price:$1,247/oz$2.97/lb

Base Case NSR:$78.73/t$36.55/t

Spot NSR:$75.53/t$33.40/t

Base Case Valuation
Reported Valuation Currency:USD
Pre-Tax NPV:$318,000,000
Discount Rate:8%
After-Tax NPV:$176,000,000
Total Base Case NSR USD:$115.28/t
Pre-Tax IRR:20%
Total Spot NSR USD:$108.93/t
After-Tax IRR:15%
Annual Pre-Tax Cash Flow Base Case and Net CF/FDSH USD:$78,496,970$0.26Pre-Tax Payback:
Annual Pre-Tax Cash Flow Spot and Net CF/FDSH USD:$69,689,570$0.23After-Tax Payback:
Enterprise Value CAD :$58,202,313$.20/shShare Price:$0.28
Note:
Comparative Valuations using Life of Mine Averages
Discount Rate:0%5%10%15%
Base Case Pre-Tax NPV USD:$803,554,550$431,729,359$220,971,352$95,436,451
Base Case Pre-Tax Net NPV/Sh USD:$2.77$1.49$0.76$0.33
Premium BC PT NPV over EV:$2.61$1.33$0.61$0.17
Spot Pre-Tax NPV USD:$671,443,550$344,664,787$160,071,548$50,653,731
Spot Pre-Tax Net NPV/Sh:$2.31$1.19$0.55$0.17
Premium Spot PT NPV over EV USD:$2.16$1.03$0.40$0.02
The comparative NPV calculations assume constant annual cash flow based on the life of mine average annual payable production and CapEx spent in year one. The operating cost includes the LOM sustaining capital. Due to details such as ore scheduling these NPV figures may differ from those of the 43-101 economic study.
After-Tax Valuations using Spot By-Product Prices

Cerro Dorado Project
Cerro DoradoDominican Republic
Dominican Republic0 ha
Net Interest: 80% WI
Vested: Yes
Uncapped NSR/GOR: 0.00%
Ownership Terms: Project occurs over two concessions, 1 100% owned by Goldquest, the other where Goldquest can earn up to 80% interest from Energold Mining Ltd.
Target Metals: Gold CopperModel: IntrusiveStage: 2-Target Drilling

Las Animas Project
Las AnimasDominican RepublicOTOther0 ha
Net Interest: 100% WI
Vested: Yes
Uncapped NSR/GOR: 0.00%
Ownership Terms:
Target Metals: Copper Gold Silver ZincModel:
Stage: 4-Infill & Metallurgy

Tireo Project
TireoDominican RepublicOTOther0 ha
Net Interest: 100% WI
Vested: Yes
Uncapped NSR/GOR: 0.00%
Ownership Terms:
Target Metals: Gold CopperModel: PorphyryStage: 2-Target Drilling
Company Related KRO Comments
Mar 10, 2017Discovery Watch with HoweStreet.com - 0:00:00
Jan 13, 2017Discovery Watch with HoweStreet.com - 0:07:35
Nov 9, 2016Discovery Watch with HoweStreet.com - 0:06:38
Oct 3, 2016Discovery Watch with HoweStreet.com - 0:15:30

Company News Releases - Members Only
Nov 17, 2017Receives Exploration Licenses From DR Government
Oct 17, 2017Intersects 21.0 Metres Grading 10.2 G/t Gold Equivalent
Sep 12, 2017Identifies New Drill Targets In The Tireo Gold Trend, Dominican Republic
Sep 8, 2017Reports Operations Were Unaffected By Hurricane Irma
Sep 1, 2017Retirement Of Ceo Julio Espaillat, Executive Chairman Bill Fisher Assumes Ceo Role
Aug 28, 2017Files Q2 2017 Financials; Provides Exploitation Concession Update
Aug 10, 2017Intersects 11.7 Metres Grading 6.3 G/t Gold At Cachimbo Discovery
Jul 13, 2017Intersects 12 Metres Grading 8.2 G/t Gold Equivalent In Follow Up Hole At Cachimbo Discovery
Jun 6, 2017Intersects Up To 22.3 G/t Gold In Follow Up Holes At Cachimbo Discovery
Apr 18, 2017Broadens And Strengthens Team With Key Additions
Apr 10, 2017Grants Incentive Stock Options
Mar 30, 2017Confirms Two New Gold Systems In The Tireo Belt, Dominican Republic
Mar 9, 2017Private Placement Non Brokered
Mar 8, 2017Goldquest Closes C$22,860,000 Strategic Investment With Agnico Eagle
Mar 6, 2017C$22,860,000 Strategic Investment By Agnico Eagle
Feb 9, 2017Acceleration of Drilling Activities at Tireo Belt, Dominican Republic
Jan 10, 2017Makes Important New Gold rich Polymetallic Discovery In Tireo Belt Grading 14 G/t Gold, 74 G/t Silver, 12% Zinc And 1% Copper Over 5 Metres
Jan 5, 2017Expands Exploration Land Holdings With Concession Grant Which Includes Las Animas Copper gold Deposit
Nov 14, 2016Files Pre feasibility Study For Romero Project, Dr
Oct 31, 2016Provides Exploration Update From The First Target Of The Tireo Drill Program, Dominican Republic
Oct 13, 2016Appoints David Massola As VP, Corporate Development
Oct 6, 2016Granted Concessions Extending Prospective Land Position By 10 Kilometres
Sep 27, 2016A Robust Pre feasibility Study & Maiden Mineral Reserves For Its Romero Project
Aug 18, 2016Kicks Off 10,000 M Drill Program On Tireo Project, Dominican Republic
Jul 28, 2016To Commence At 10,000 Metre Drill Program In August
Jun 22, 2016Private Placement Brokered
Jun 15, 2016Provides Exploration Update On Tireo Project, Dominican Republic
Jun 9, 2016Closes $5.75 Million Bought Deal Private Placement
Jun 1, 2016Engages Red Cloud As Investor Relations Representation
May 19, 2016C$5 Million Bought Deal Financing
May 18, 2016Issues Update On Pre Feasibility Study For The Romero Project, Dominican Republic
May 17, 2016Identifies Significant Gold Mineralization In Cachimbo Area: Up To 167 G/t Gold At Surface
May 5, 2016Granted Additional Exploration License; Geophysical Anomalies Update
Apr 12, 2016Granted New Exploration License; Geophysical Anomalies Strengthened And Expanded
Mar 31, 2016Identifies New Exploration Targets Near Romero, Dominican Republic
Mar 15, 2016Proposed Private Placement Of Up To C$3 Million
Feb 22, 2016Goldquest And Precipitate's Geochemical Compilation Reinforces Camp Scale Potential And Highlights New Target Areas
Feb 16, 2016Goldquest's Data Collaboration With Precipitate Defines New Gold copper Targets With "district Scale" Potential In The Dominican Republic
Jan 21, 2016Romero Pre Feasibility Study Advancing On Schedule
Dec 15, 2015Grants Incentive Stock Options
Nov 18, 2015Private Placement Non Brokered
Nov 18, 2015Enters Into Capital Markets Advisory Services Agreement
Nov 11, 2015Launches Feasibility Studies For Its Romero Gold/copper Project: Met chem Selected As Lead Consultant
Oct 27, 2015Reports 224 Metres Grading 4.8 G/t Gold Equivalent From Pre feasibility Drilling At Romero Project
Oct 19, 2015Closes First Tranche Of Private Placement
Oct 14, 2015Increases Proposed Private Placement To Up To C$3.5 Million
Oct 7, 2015Hires Engineering Manager, Awards Contract For Road Design For Its Romero Gold/copper Project
Oct 5, 2015Proposed Private Placement Of Up To C$3.2 Million
Oct 1, 201543 Metres Grading 7.88 G/t Gold And 1.41% Copper From Pre feasibility Drilling At Romero Project
Sep 30, 2015Goldquest And Precipitate Sign Collaborative Exploration And Data sharing Agreement
Sep 30, 2015Precipitate And Goldquest Sign Collaborative Exploration And Data sharing Agreement
Jul 15, 2015Granted Concession Near Romero Gold/copper Project, Dominican Republic
Jun 11, 2015Starts Pre feasiblity Drilling At Romero Au/cu Project And Reports On Exploration Results
Jun 2, 2015Goldquest Files Revised Pea Technical Report For Romero Gold copper Project On Sedar
Apr 29, 2015Highlights Of Revised Pea For Romero Gold copper Project
Apr 13, 2015Engages JDS Energy & Mining To Optimize PEA For The Romero Project, Dominican Republic
Mar 31, 2015Assay Results From First Holes At Imperial And La Bestita In Dominican Republic
Feb 19, 2015To Attend Bmo 2015 Global Metals & Mining Conference And Pdac Convention 2015
Jan 27, 2015Commences 5,000 Metre Exploration Drill Program Surrounding The Romero Project, Dominican Republic Vice President, Investor Relations Appointed
Jan 21, 2015Grants Incentive Stock Options
Jan 13, 2015Granted Concession Near Its Romero Gold/copper Project, Dominican Republic
Jan 6, 2015Granted New Concessions Surrounding Its Romero Gold/copper Project, Dominican Republic
Nov 20, 2014Exploration Update For Tireo Project, Dominican Republic
Oct 10, 2014Quarterly Review of S&P/TSX Venture Select, Composite Buyback and Composite Shareholder Yield Indices
Sep 4, 2014Goldquest: Exploration And Metallurgical Update For Tireo And Romero Projects, Dominican Republic
Aug 14, 2014Increases Land Package By 21% Surrounding Its Romero Gold/Copper Project, Dominican Republic
Jul 31, 2014Releases Drill Results And Exploration Update At Tireo Project In The San Juan District, Dominican Republic
Jul 16, 2014Files Preliminary Economic Assessment For Gold copper
May 27, 2014Positive Preliminary Economic Assessment For The Romero Gold Copper Project, Dominican Republic
May 14, 2014Corporate Update
May 6, 2014Commences 10,000m Exploration Drill Program Surrounding The Romero Project, Dominican Republic
Apr 15, 20143,285 Km Ztem Airborne Survey Completed For Tireo Project, Dominican Republic, Surrounding The Gold/copper Romero Project
Feb 21, 2014Update On The Pea For The Romero Gold Discovery, Dominican Republic
Feb 14, 2014Commences Ztem Airborne Survey Of The Tireo Concessions Surrounding The Romero Gold Discovery, Dominican Republic
Jan 9, 2014Granted The Descansadero Concession, Dominican Republic And Commissions Ztem Airborne Survey
Dec 19, 2013Grants Incentive Stock Options
Dec 18, 2013Files Ni 43 101 Technical Report For Romero Project
Nov 28, 2013Engages Micon International To Conduct A Preliminary Economic Assessment ("pea") For The Romero Gold Project, Dominican Republic
Nov 26, 201350% Increase In Land Package With Granting Of Loma Los Comios Concession In Dominican Republic
Oct 29, 2013Maiden Resource Estimate From Romero And Update At Romero South; Indicated Resource Of 2.4 Million Oz. Gold Equivalent; Inferred Resource Of 0.8 Million Oz. Gold Equivalent
Oct 10, 2013Goldquest, Micromem Technologies, Cynapsus Therapeutics And Excalibur Resources Featured On Episode 14 Of The Next Biggest Winner Tv Show This Weekend
Oct 2, 2013Romero Results From In fill Drilling And Provides Exploration


 

You can return to the Top of this page


Copyright © 2017 Kaiser Research Online, All Rights Reserved