 Corporate Profile: Southern Silver Exploration Corp
    Publisher: Kaiser Research Online
    Author: Copyright 2013 John A. Kaiser

 
Southern Silver Expl Corp (SSV-V)
Trade DateVolumeHighLowCloseChgStatus
April 23, 2024213,000$0.20$0.19$0.20($0.01)Trading
KRO Profile - Members OnlyCorporate Web Site Not AvailableTreeExchQuote
Issued
291,546,757
Price
$0.195
Working Capital
$1,440,750
Key People: Lawrence P. Page (Pres), Graham Thatcher (CFO), Robert W. J. Macdonald (VP EX), Arie Page (Sec),
Diluted
371,160,514
Insiders
14.7%
As of
1/31/2024
Company supplied Corporate Overview - not available
The free corporate profile serves as a fast gateway for KRO members via the map cards to resources such as the KRO Profile which includes financial, insider and project details as well as news releases and KRO comments for which headline links are provided below. Links to the company's web site and project web pages are available within this free corporate profile if the company has a multi-user corporate membership (they are always available in full member only KRO Profile). A corporate membership provides the company with complete multiple user access to KRO resources and entitles the company to provide a corporate overview for the subject company's unrestricted corporate profile.

Active Project List
ProjectCountryState/ProvRegionNet
Interest
StageIPV $
MM
Target MetalsDeposit StyleTSC
(Project Name has a link to its location in the Members only KRO Profile)
Cerro Las MintasMexicoOtherDurango40% WI4-Infill & Metallurgy $186Silver Lead ZincSkarn
OroUnited StatesNew MexicoNot Applicable100% WI2-Target Drilling $74Copper Molybdenum GoldPorphyry
Company Project Gateway
Cerro Las Mintas Project
Company Project Web Page - N/A Mexico - Other 40% WI4-Infill & Metallurgy Silver Lead ZincSkarn
Oro Project
Company Project Web Page - N/A United States - New Mexico 100% WI2-Target Drilling Copper Molybdenum GoldPorphyry
Company News Releases - Members Only
Sep 27, 2023Corporate Update
Jul 5, 2023Launches Interactive 3D and 360 Degree Presentation for the Cerro Las Minitas Project, Mexico, on the VRIFY Platform
Jun 27, 2023Significant Recovery of By Product Gold in Metallurgical Testwork on the Cerro Las Minitas Project, Mexico
Jun 2, 2023CORRECTION, Warrant Term Extension
May 12, 2023Warrant Term Extension
May 12, 2023Warrant Term Extension
May 12, 2023Warrant Term Extension
May 12, 2023Warrant Term Extension
May 11, 2023Warrant Term Extension
Apr 3, 20239.1metres of 0.92% CuEq (0.59% Cu, 0.3g/t Au, 0.01% Mo, and 2.3g/t Ag) in a Recon Hole Testing Skarn/CRD Mineralization at the Oro Project, New Mexico; Corporate Update
Mar 22, 2023Mineral Resource Update That Includes Newly Identified Shallow High Grade Deposit at the Cerro Las Minitas Project
Oct 31, 2022Continues to Identify High grade Silver Within a 400 Metre Strike at the Cerro Las Minitas Project; Oro Cu Au Mo Project, Update
Oct 13, 2022CORRECTION FROM SOURCE: Files NI43 101 Technical Report for its Preliminary Economic Assessment for the Cerro Las Minitas Project
Sep 28, 2022Corporate Update
Sep 13, 2022Thick Zone of Copper Mineralization at Oro, Cu Au Project, New Mexico
Aug 29, 2022Preliminary Economic Assessment on Cerro Las Minitas with After Tax Net Present Value at a 5% Discounted Rate of US$349M, Internal Rate of Return of 17.9% and a 60 Month Payback
Jul 25, 2022Returns High Grade Silver from the North Felsite Zone Including: 1.6 Metre Averaging 675g/t Ag, 0.3% Cu, 5.5% Pb and 3.4% Zn (1,008g/t AgEq) at Cerro Las Minitas
May 4, 2022Returns Bonanza Grade Silver from the North Felsite Zone Including:
Feb 28, 2022Commences Drilling on the Oro Copper Project, New Mexico; Acquires 100% Interest in the El Sol Claim, CLM Project, Mexico
Feb 14, 2022Extends New North Felsite Zone with Multiple Drill Intercepts Including: 11.8 Metres Averaging 185g/t Ag, 0.2g/t Au, 2.8% Pb and 1.0% Zn at Cerro Las Minitas
Jan 25, 2022Identifies New Discovery on the El Sol Claim with 3.5 Metres Averaging 549g/t Ag, 0.3g/t Au, 8.6% Pb and 3.6% Zn (982g/t AgEq); Drilling Resumes
Jan 18, 2022Oro Copper Porphyry Property Is Fully Permitted with Drilling Commencing Within Two Weeks
Dec 21, 2021Options the Hermanas Au/Ag Project, New Mexico
Dec 15, 2021Technical Report on CLM Project Provides Increased Silver, Lead and Zinc Mineral Resource Estimates
Dec 9, 2021Engages ITG for Market Making Services
Nov 15, 2021Intersects 2.7 Metres Averaging 599g/t Ag, 16.9% Pb and 10.2% Zn (1530g/t AgEq) at Cerro Las Minitas; Updates Progress on Oro Project
Oct 27, 2021A Significant Increase to the Mineral Resource at Cerro Las Minitas
Sep 29, 2021Appointment of Director and Consultant
Sep 20, 2021Completes Final Payment to Acquire 100% Interest in the Cerro Las Minitas Silver Project
Aug 11, 2021Provides Exercise Instructions for Warrants Dated September 11, 2020
Aug 11, 2021Intersects 1.4 metres averaging 383g/t Ag, 7.9% Pb and 10.2% Zn (1051g/t AgEq) within a 10.8 metre Interval averaging 102g/t Ag, 1.8% Pb and 1.7% Zn (234g/t AgEq) at Cerro Las Minitas
Jul 26, 2021Receives Technical Approvals for a Drill Program to Test Several Copper Targets at the Oro Project, New Mexico
Jul 21, 2021Intersects Shallow High Grade Silver at the South Skarn Target Including 1.4 Metres Averaging 719g/t Ag, 14.2% Pb and 16.0g/t Zn (1791g/t AgEq) at Cerro Las Minitas
Jul 6, 2021Continues to Extend Mineralization on the Mina La Bocona and South Skarn Targets at the Cerro Las Minitas Project
Jun 24, 2021Private Placement Brokered
Jun 23, 2021Private Placement Non Brokered
Jun 22, 2021Closes $3.0M Non Brokered Private Placement
Jun 16, 2021Closes $9.0M Brokered Private Placement
May 26, 2021Upsizing of Previously Announced Private Placements to up to C$12.0 Million
May 25, 2021C$7.0 Million Bought Deal Private Placement and C$2.0 Million Non Brokered Private Placement
May 19, 2021Commencement of Trading on the OTCQX
Apr 27, 2021Continues to Extend Mina La Bocona High Grade with 7.5 Metres Averaging 261g/t Ag, 7.0% Pb and 1.7% Zn (559g/t AgEq)
Mar 29, 2021Intersects High grade Copper Silver Gold at the Bocona Target with 6.3 Metres Averaging 134g/t Ag, 0.5g/t Au, 2.3% Cu (461g/t AgEq) including 1.1 Metres Averaging 567g/t Ag, 2.3g/t Au
Mar 17, 2021Recent Property and Corporate Matters
Feb 9, 2021Intersects Bonanza Grade Silver at Cerro Las Minitas with 8.0 Metres Averaging 1,072g/t Ag, 18.8% Pb and 7.5% Zn (2,040g/t AgEq) including 0.6 Metres Grading 3,180g/t Ag, 58.8% Pb and 2.3%
Jan 21, 2021Extends Oxide Gold and Sulphide Zones at Cerro Las Minitas with 6.1 Metres Averaging 344g/t Ag, 5.7% Pb and 3.9% Zn (728g/t AgEq) and 1.0 Metre Grading 1070g/t Ag, 23.3% Pb
Dec 16, 2020Confirms New Gold Zone at Cerro Las Minitas with a 28.5 Metre Intercept Averaging 1.41g/t Au and 36g/t Ag, (201g/t AgEq)
Dec 10, 2020Continues to Identify High grade Mineralization in the South Skarn Target at Cerro Las Minitas with a 10.4 Metre Intercept Averaging 172g/t Ag, 3.8% Pb and 3.7% Zn (520g/t AgEq; 10.7% ZnEq)
Nov 12, 2020Confirms High Grade Mineralization in the South Skarn Target at Cerro Las Minitas with a 6.7 Metre Intercept Averaging 625g/t Ag, 11.8% Pb and 7.5% Zn (1,454g/t AgEq; 30.0% ZnEq)
Sep 24, 2020Targets Resource Expansion as Drill Crews Mobilize to the Cerro Las Minitas Ag Pb Zn Project
Sep 21, 2020Reviewable Transaction
Sep 16, 2020Closes Transaction to Acquire 100% Interest in the Cerro Las Minitas Silver Project; Closes Three Private Placements for Proceeds of $14.456 Million
Sep 15, 2020Private Placement Non Brokered
Sep 14, 2020Closes Previously Announced Private Placement
Sep 9, 2020Corporate Update
Aug 17, 2020Closes Both C$10 Million Brokered and C$4 Million Non Brokered Private Placements
Jul 28, 2020Equity Raise and Announces Additional C$4 Million Equity Raise
Jun 22, 2020C$7 Million Private Placement Financing
Jun 22, 2020Transformative Transaction to Acquire 100% of its Flagship Cerro Las Minitas Silver Project
May 26, 2020the Extension of the Expiry Date of Certain Common Share Purchase Warrants
May 26, 2020Warrant Term Extension
Apr 3, 2020Acquisition of El Sol Claim; Corporate Update
Jan 30, 2020Retains Red Cloud Financial Services Inc. as Capital Markets Advisor
Jan 16, 2020Increases Value of Concentrates in Locked cycle Test work
Dec 20, 2019Appoints Director
Oct 1, 2019Provides Corporate Update
Sep 5, 2019Closes Final Tranche of Oversubscribed Private Placement
Aug 14, 2019Closes First Tranche of Over Subscribed Financing
Jul 24, 2019Southern Silver Announces Equity Financing and Warrant Exercise
Jun 24, 2019Technical Report on CLM Project Provides Increased Silver, Lead and Zinc Grade and Tonnage Estimates
May 9, 2019Increases Mineral Resource at Cerro Las Mintas to
Feb 28, 2019Intersects 2.0m averaging 409g/t Ag, 0.9% Cu, 0.8% Pb and 8.4% Zn (871g/t AgEq; 24.6% ZnEq) in Drilling at Cerro Las Minitas
Oct 29, 2018Extends High Grade Mineralization in North Skarn Target with an 3.4m Intercept of 191g/t Ag, 0.9% Cu, 3.7% Pb and 9.4% Zn (747g/t AgEq; 21.1% ZnEq)
Sep 19, 2018Substantially Increases Zinc Recoveries and Grades in New Metallurgical Test Results; Generates Separate Copper Concentrate
Sep 6, 2018Continues to Extend High Grade Mineralization at Cerro Las Minitas with an 18.9m Intercept of 260g/t Ag, 0.18% Cu, 0.9% Pb and 0.1% Zn (317g/t AgEq; 8.9% ZnEq)
Jul 19, 2018Mobilizes Second Drill to Cerro Las Minitas; Targeting Ag Au Epithermal Vein Systems
May 29, 2018Corporate Update
May 28, 2018Shares for Services
May 14, 2018Mobilizes Crews For Cerro Las Minitas Drill Program; Announces New Metallurgical Results
Apr 5, 201813,000 Metres Of Drilling In 2018 Exploration For Cerro Las Minitas Project
Mar 13, 2018Initial Analyst Coverage Report by Fundamental Research Corp.
Feb 23, 2018Southern Silver Files Cerro Las Minitas Technical Report
Feb 21, 2018Identifies New Drill Targets at CLM West Claims
Jan 8, 2018Cerro Las Minitas Increases Resource to: Indicated: 33.6Mozs Ag, 319Mlbs Pb and 813Mlbs Zn (116.1Mozs AgEq; 1.69Blbs ZnEq); and Inferred: 20.7Mozs Ag, 131Mlbs Pb and 870Mlbs Zn (92.7Mozs AgEq;
Dec 12, 2017Assigned Legal Entity Identifier Number by Deutsche Borse Group
Nov 6, 2017Intersects High grade Massive Sulphides in Final Drill Hole at Cerro Las Minitas
Oct 18, 2017Drilling Underway at Stockpond Target, Oro Project, New Mexico
Oct 2, 2017Private Placement Brokered
Oct 2, 2017Closes Final Tranche of Financing
Sep 15, 2017Extends Final Closing of Non Brokered and Brokered Private Placement
Sep 6, 2017Enlarges High Grade Extension at Cerro Las Minitas Returning 6.8m (est. TT) Grading 194g/t Ag, 0.8g/t Au, 4.4% Pb, and 2.0% Zn (480g/t AgEq; 13.6% ZnEq) in Recent Drilling
Aug 31, 2017Closes Second Tranche Of Brokered And Non Brokered Financing
Aug 16, 2017Extends Closing Of Brokered Financing
Jul 25, 2017Hits High Grade Extension at Cerro Las Minitas 31.3%
Jul 21, 2017Interview Examines How Southern Silver Exploration Is On Target To Issue Upgraded Resource By Early Fall
Jul 17, 2017CORRECTION FROM SOURCE: Southern Silver Expands Surface Targets on Newly Acquired Cerro Las Minitas Claims
Jul 11, 2017Extends Silver Copper Zone to 32.2m (est. TT) of 105g/t Ag and 0.9% Cu on Cerro Las Minitas Polymetallic Project
Jun 27, 2017Commences Airborne Z TEM Survey on the Oro Project
Jun 13, 2017Electrum Global Holdings L.p. Acquires Securities Of Southern Silver Exploration Corp.
Jun 13, 2017Closes First Tranche of Brokered Financing
Jun 12, 2017Extends High Grade Mineralization at Cerro Las Minitas
May 18, 2017Brokered Private Placement With Gravitas Securities
May 4, 2017Acquires Strategic Claims At Cerro Las Minitas
Apr 4, 2017Corporate Update
Mar 29, 2017The Gold Report Examines Southern Silver's High grade Results At Cerro Las Minitas
Mar 20, 2017Intersects 6.5m (est. Tt) Grading 737g/t Ag, 8.6% Pb, And 21.8% Zn (1814g/t Ageq; 51.2% Zneq) At Cerro Las Minitas; Extends High grade Blind Shoulder Mineralization
Jan 19, 2017Intersects 14.8m Grading 39.4g/t Ag, 0.1% Pb, And 10.2% Zn (410g/t Ageq; 11.6% Zneq) At Cerro Las Minitas; Second Drill Mobilized To Property
Jan 13, 2017The Gold Report Examines How The High grade Gold Discovery In New Mexico Doubles The Opportunities For Southern Silver Exploration
Nov 23, 2016Identifies A Widespread Oxide Gold System At The Stockpond Target, Oro Project, New Mexico
Oct 26, 2016Commences US$2.0 Million Exploration Program On Cerro Las Minitas
Sep 28, 2016Progress On Cerro Las Minitas And Oro Projects
Sep 6, 2016Exploration Recommences On Oro And Cerro Las Mintas Projects
Aug 10, 20162016 Drilling at Cerro Las Minitas Identifies New Mineralized Extension and Continuity of Contact Skarn
Aug 9, 20162016 Drilling At Cerro Las Minitas Identifies New Mineralized Extension And Continuity Of Contact Skarn
Jul 18, 2016Accepted For Trading On The Otcqb
Jul 12, 2016Clarifies Trading On The OTCQB
Jul 12, 2016Commences Field Work At Oro; Begins Trading On The Otcqb
Jun 13, 2016Intersects 29.5m Grading 107.4g/t Ag, 0.40% Cu, 1.1% Pb And 2.3% Zn (275g/t Ageq) At Cerro Las Minitas
May 26, 2016Correction From Source: Southern Silver Closes Oversubscribed $1.1 Million Non brokered Financing; Prepares For Oro Exploration Program, New Mexico
May 19, 2016Private Placement Non Brokered
May 16, 2016Purchases Land And Equipment At Cerro Las Minitas; Provides Corporate Update
May 11, 2016Deep Value And Big Upside
Apr 29, 2016Equity Financing For Oro Gold Project Drill Program, New Mexico
Apr 22, 2016Grants Stock Options
Apr 8, 2016Closes Non brokered Financing; Prepares For Commencement Of Drilling
Apr 7, 2016Private Placement Non Brokered
Apr 5, 2016Corporate Update
Mar 31, 2016Commences 2016 Exploration Program At Cerro Las Minitas
Mar 21, 2016Resource Estimate At Cerro Las Minitas: Indicated: 10.8mozs Ag, 189mlbs Pb And 207mlbs Zn (36.5mozs Ageq); And Inferred: 17.5mozs Ag, 237mlbs Pb And 626mlbs Zn (77.3mozs Ageq)
Mar 8, 2016Electrum Global Holdings L.P. Acquires Securities Of Southern Silver Exploration Corp.
Mar 7, 2016Closes First Tranche Of Non Brokered Financing
Feb 16, 2016Announces Equity Financing
Jan 13, 2016Drills 12.8m Of 348g/t Ageq And Extends The Blind El Sol And La Bocona Zones On Its Cerro Las Minitas Project
Dec 1, 2015Identifies New Thick High grade Massive Sulphide Extension At Its Cerro Las Minitas Project
Nov 18, 2015Electrum Completes Initial Earn in On Southern Silver's Cerro Las Minitas Project, Mexico; Exploration Update
Oct 29, 2015Southern Silver Substantially Extends Mineralization
Oct 5, 2015Southern Silver Listing On Santiago Stock Exchange; Appoints Corporate Relations Consultant
Oct 1, 2015Identifies New High grade Gold silver Discovery And Extends Known Zones At Cerro Las Minitas
Jul 30, 2015Property Asset or Share Disposition Agreement
Jul 30, 2015Corporate Matters
Jul 7, 2015Starts Drilling On Cerro Las Minitas And Releases Encouraging Metallurgical Results
Jun 29, 2015Property Asset or Share Disposition Agreement
Jun 29, 2015Private Placement Non Brokered
Jun 29, 2015Closes $1 Million Unit Offering And Commences $2 Million Exploration Program At Cerro Las Minitas
May 20, 2015Electrum Global Holdings L.P. Announces Earn In Agreement With Southern Silver
May 19, 2015Earn in Agreement With The Electrum Group And Proposed Exploration Program At The Cerro Las Minitas Property
May 19, 2015Units Offering To Existing Shareholders
Mar 26, 2015Pays Credit Facility; Appoints Directors
Mar 26, 2015Early Warning Report
Mar 13, 2015Private Placement Non Brokered
Mar 11, 2015Closes Private Placement
Mar 9, 2015Electrum Global Holdings L.P. Acquires Securities of Southern Silver Exploration Corp.
Mar 6, 2015Reports On Equity Raise And Corporate Matters
Jan 28, 2015Private Placement And Corporate Review
Jan 23, 2015Shares for Bonuses
Dec 10, 2014Private Placement Non Brokered, Convertible Debenture/s
Nov 20, 2014SSV Obtains Loan Facility To Fund Final Option Payments At Cerro Las Minitas
Oct 29, 2014Southern Silver Completes Cerro Las Minitas Property Transfer From Freeport; Appoints Spiering To The Board
Sep 16, 2014Consolidation
Sep 12, 2014Reports On Cerro Las Minitas Project And Announces Capital Consolidation
Aug 5, 2014Southern Silver Re acquires Oro Project; Provides Corporate Update
Jul 4, 2014Shares for Services
Jun 9, 2014Fmec Funds A $250,000 Option Payment; Drilling Continues At Cerro Las Minitas
Apr 22, 2014Shares for Services
Mar 24, 2014New Drill Program At Cerro Las Minitas, Durango Mexico
Mar 12, 2014Shares for Services
Feb 27, 2014Fmec Funds A Further $250,000 Option Payment And Completes Second Phase Drill Program At Cerro Las Minitas
Feb 18, 2014Private Placement Non Brokered, Amendment
Nov 26, 2013FMEC Funds $250,000 Option Payment And Commences Second Phase Drill Program At Cerro Las Minitas
Nov 4, 2013FMEC Reports First Year Exploration Results And Funding Of A Second Phase Of Drilling At Cerro Las Minitas
Oct 31, 2013Private Placement Non Brokered, Amendment
Oct 22, 2013Private Placement Non Brokered
Oct 21, 2013Closes Oversubscribed Financing
Sep 23, 2013Southern Silver Announces That Cerro Las Minitas Project Expanded With Acquisition Of An Interest In The Contiguous El Sol Concession
Sep 23, 2013Closes First Tranche Of Financing
Sep 20, 2013Private Placement Non Brokered

 
 