Kaiser Bottom Fish OnlineFree trialNew StuffHow It WorksContact UsTerms of UseHome
Specializing in Canadian Stocks
SearchAdvanced Search
Welcome Guest User   (more...)
Home / Companies / KRO Profile
KRO Profile
KRO Company Profile

Dominion Diamond Corp (DDC-T)

RSSearchWeb SiteTreeForumSEDARQuoteIPV
Trade DateVolumeHighLowCloseChgStatus
May 25, 201753,000$17.46$17.25$17.43$0.02Trading
Basic Info
Listed On:TSX: DDC6/21/1994Sector:ResourceKey People
Issued:80,952,2571/31/2017Story Type:Diamond ProducerBrendan Bell (CEO), James K. Gowans (Chair), Chantal Lavoie (COO)
Diluted:83,726,936
JK Owns:No
Insider Stake:42%7/15/2015Tel:(416) 362-2237
Working Capital:$434,502,0001/31/2017Email:Address
Market Cap:$1,410,997,840
Web Site:ddcorp.caPO BOX 4569 Station A, Toronto, ON, M5W 4T9, Canada
Cash Breakup:($2.16)per shTwitter:
Corporate Change History


#Old for NewLast PricePrior NameSubsequent NameDetails
Mar 27, 2013Name Change1:1$16.76Harry Winston Diamond Corp (HW-T)Dominion Diamond Corp (DDC-T)
Ranking within Company's Price Range based Group
All KRO as of May 25, 2017Group MedianCompanyPercentileScore
Price Range:above $10.00Issued:164,967,46480,952,25774.1%72.2%
Price Group Total:27Working Cap:$133,910,000$434,502,00070.4%
Group figures exclude delisted and suspended companies. The higher the company percentile the better, based on the assumptions that the lowest issued shares and highest working capital are best. The score is the average of the percentiles. A percentile is that percentage of a group that a member ranks higher than. Note that issued and WC reflect latest financials.
History of Past Recommendations
Edition Date Price
Recommendation Gain
SV2009 3/20/2009 $3.08 Good Absolute Spec Value Buy 0%
SV2009 12/30/2011 $10.86 SV Technical Closeout Hold 0% 253%
Charts & Financing Activity

 Most recent 43-101 resource estimate  Prior resource estimate  PEA  PFS  FS/BFS/DFS
Private Placement Key
less than $500,000 $1,000,000 - $2,000,000 $5,000,000 - $10,000,000 $20,000,000 - $50,000,000
$500,000 - $1,000,000 $2,000,000 - $5,000,000 $10,000,000 - $20,000,000 over $50,000,000
Private placement financing dates and value ranges are based on transactions reported by the TSXV Monthly Review.
Date Company Type Quantity Price FT Units Amount Broker
No Financing Data Available
Capital
Financials Dated: January 31, 2017 Reporting Period: 12 months Year End: 01/31 Currency: USD
Assets Liabilities Income
Cash Equivalents: $136,168 Current Liabilities: $175,324,000 Operating Revenues: $570,855,000
Receivables etc: $609,689,832 Tangible LT Debt: $344,267,000 Operating Cash Costs: $660,163,000
Current Assets: $609,826,000 Intangible LT Debt: $155,380,000 Operating Cash Flow: ($89,308,000)
Long Term Assets:$1,394,050,000Total Liabilities:$674,971,000Operating Non-Cash Costs:($76,551,000)




Miscellaneous Revenue:$60,623,000
Total Assets: $2,003,876,000 Share Capital: $510,193,000 Cash Expenses: $0


Shareholder Deficit: $818,712,000 Non-Cash Expenses: $0
Working Capital: $434,502,000 Net Shareholder Equity: $1,328,905,000 Total Expenses: $0




Overall Cash Flow:($89,308,000)
Monthly Overhead:$0

Net Income (Loss):($12,757,000)

Note:
Structure & People
Directors, Officers and Employees: 1,167,647 1.4% AGM: July 20, 2016
Other Insiders: 32,489,602 40.1% People Tree Available
Past Reported Shareholders: 51,000 N/A
Related Party Occupation Related
Since
Insider Director Officer Capacity Ownership %
Brendan Bell
11/1/2014 CEO 0 0.0%
Graham G. Clow Mining Excutive 1/1/2013

4,000 0.0%
Robert A. Gannicott Geologist 6/19/1992

1,114,050 1.4%
James K. Gowans Engineer 1/13/2016 Chairman 0 0.0%
Noel Harwerth Lawyer 6/4/2008

5,000 0.0%
Daniel Jarvis Investment Banker 6/4/2008

7,000 0.0%
Tom Kenny Businessman 7/19/2013

34,129 0.0%
Ollie Oliveira Accountant 7/19/2013

0 0.0%
Fiona Perrott-Humphrey Analyst 7/16/2014

0 0.0%
David S. Smith Accountant 2/22/2016

0 0.0%
Chuck Strahl Politician 1/1/2012

3,468 0.0%
Josef Vejvoda
1/13/2016

0 0.0%
Black Rock Inc. Investment Banker 7/20/2016


11,356,722 14.0%
Chantal Lavoie Engineer 5/27/2013
COO 0 0.0%
M&G Investment Management Ltd. Institution 7/20/2016


11,293,473 14.0%
Vanguard Precious Metals & Mining Fund Institution 7/18/2012

Placee 9,839,407 12.2%
Past Insiders and Reported Shareholders - Current Ownership Status unknown
Related Party Occupation Related
Since
Insider
Ended
Director
Ended

Capacity Ownership
Matthew W. Barrett
1/15/2008 7/19/2013 7/19/2013
Director 10,000
Thomas M. Boehlert Accountant 4/2/2009 7/18/2012 7/18/2012
Director 0
Micheline Bouchard Engineer 1/15/2008 7/19/2013 7/19/2013
Director 4,000
David Carey
1/1/2010 7/19/2013 7/19/2013
Director 0
Lars-Eric Johansson
6/2/2003
6/4/2008
Director 0
Kinross Gold Corp Public Company 6/4/2009 3/23/2011

Insider 0
John C. Lamacraft

6/4/2008 6/4/2008
Director 0
Lyndon Lea
12/3/2004 6/4/2009 6/4/2009
Director 0
Jean-Marc Loubier
1/1/2010 7/19/2013 7/19/2013
Director 0
Donald S. Macdonald Lawyer

6/4/2008
Director 0
Laurent E. Mommeja
6/22/2004 7/19/2013 7/19/2013
Director 0
Thomas J. O'Neill Retired 7/22/2002 6/3/2010 6/3/2010
President 0
John H. Parker


6/4/2008
Director 0
J. Roger B. Phillimore
11/17/1994 7/19/2013 7/19/2013
Director 25,000
D. Grenville Thomas


6/4/2008
Director 0
Eira M. Thomas Geologist 4/28/1998
6/4/2008
Director 10,000
John M Willson
1/25/2005
6/4/2008
Director 2,000
Share positions of current insiders based on last AGM circular, ownership % based on current Issued. Share positions of past insiders and shareholders have not been adjusted for rollbacks or splits.
Active Index Memberships
Membership Start Date:December 30, 2011Start Price:$10.86
KRO Diamond Index: The KRO Diamond Index is based on Canadian listed companies that were actively focused on exploring, developing or mining diamond deposits as of December 30, 2011. It replaces the prior Canadian Junior Diamond Index whose membership has undergone severe attrition through mergers and capitulation since its formation on January 4, 2005. Index members as of the index start date are back dated to Jan 4, 2010 or their post-rollback trading date. Companies are added to the index effective the day it is clear they have become eligible for membership, and discontinued when they change their focus away from diamonds.
Risk Analysis

Click here to view IPV Report

Key to Understanding the Spec Value Hunter Tables
Flagship Play Secondary Plays Other Plays
A Spec Value Hunter table allows speculators to identify which projects offer poor, fair or good speculative value according to the rational speculation model. The speculative value depends on the project stage, the project's implied value as calculated by the company's fully diluted, stock price and net project interest, and the dream target deemed appropriate for the project. A dream target is what a project would be worth in discounted cash flow terms once in production.
Poor Speculative Value - Fair Speculative Value - Good Speculative Value -
Note: narrow arrows indicate IPV is outside the fair value channel but within 25% of the fair value limits
Active Company Projects
ProjectCountryRegionNet
Interest
StageIPV $
MM

$100
UPV
$500

$2000
Target MetalsDeposit Style
Ekati - CoreCanadaCentral Slave80% WI9-Production $1,824 DiamondKimberlite
DiavikCanadaLac de Gras40% WI9-Production $3,648 DiamondKimberlite
Ekati - BufferCanadaCentral Slave58.8% WI7-Permitting & Feasibility $2,482 DiamondKimberlite
Company Projects

Ekati - Core Project
Ekati - CoreCanadaNTCentral Slave173,024 ha
Net Interest: 80% WI
Vested: Yes
Uncapped NSR/GOR: 0.00%
Ownership Terms: Acquired 80% of the Core claims and 58.8% of the Buffer claims from BHP Billiton on April 10, 2013 for US $553 million and a $126 million letter of credit to the Canadian government for the reclamation liability.
Target Metals: DiamondModel: KimberliteStage: 9-Production
Implied Project ValueJK Dream Target$100 million$500 million$2 billionSpeculative Value
$1,824,200,618Not Rated
Base Case Resource Estimates
Project Resource Estimate - Ekati - Core - Koala Underground
May 24, 2013NI 43-101Mats Heimersson PEng, Jon Carlson, P.GeoCutoff: 1.0 mm
Note: Carat values as of Dec 31, 2012 assuming 1.2 mm process plant cutoff, resource at 1.0 mm cutoff, recoveries reflect adjustment to 1.2 mm plant. Values $358/ct for Ph5 RVK, $415/ct Ph6 VK, $422/ct Ph7 VK/MK.
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources7,400,000$239/tDiamond60.0 cpht100.0%4,440,000 ct100%
Inferred Mineral Resources300,000$398/tDiamond100.0 cpht100.0%300,000 ct100%
All Categories Spot7,700,000$245/tDiamond61.6 cpht
4,740,000 ct100%
Spot Gross Metal ValueMarket Cap as % of Net GMVSpot Prices Used
$1,886,520,00096.7%Diamond $398.00/ct
Project Resource Estimate - Ekati - Core - Koala North UG
May 24, 2013NI 43-101Mats Heimersson PEng, Jon Carlson, P.GeoCutoff: 1.0 mm
Note: Carat values as of Dec 31, 2012 assuming 1.2 mm process plant cutoff, resource at 1.0 mm cutoff, recoveries reflect adjustment to 1.2 mm plant.
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources300,000$261/tDiamond60.0 cpht100.0%180,000 ct100%
Inferred Mineral Resources200,000$261/tDiamond60.0 cpht100.0%120,000 ct100%
All Categories Spot500,000$261/tDiamond60.0 cpht
300,000 ct100%
Spot Gross Metal ValueMarket Cap as % of Net GMVSpot Prices Used
$130,500,0001,397.9%Diamond $435.00/ct
Project Resource Estimate - Ekati - Core - Fox Open Pit
May 24, 2013NI 43-101Mats Heimersson PEng, Jon Carlson, P.GeoCutoff: 1.0 mm
Note: Carat values as of Dec 31, 2012 assuming 1.2 mm process plant cutoff, resource at 1.0 mm cutoff, recoveries reflect adjustment to 1.2 mm plant.
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources10,300,000$62/tDiamond20.0 cpht95.0%2,060,000 ct100%
Inferred Mineral Resources1,100,000$94/tDiamond30.0 cpht95.0%330,000 ct100%
All Categories Spot11,400,000$65/tDiamond21.0 cpht
2,390,000 ct100%
Spot Gross Metal ValueMarket Cap as % of Net GMVSpot Prices Used
$745,680,000244.6%Diamond $312.00/ct
Project Resource Estimate - Ekati - Core - Fox Underground
May 24, 2013NI 43-101Mats Heimersson PEng, Jon Carlson, P.GeoCutoff: 1.0 mm
Note: Carat values as of Dec 31, 2012 assuming 1.2 mm process plant cutoff, resource at 1.0 mm cutoff, recoveries reflect adjustment to 1.2 mm plant.
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources20,200,000$94/tDiamond30.0 cpht95.0%6,060,000 ct100%
Inferred Mineral Resources5,600,000$95/tDiamond30.0 cpht95.0%1,680,000 ct100%
All Categories Spot25,800,000$94/tDiamond30.0 cpht
7,740,000 ct100%
Spot Gross Metal ValueMarket Cap as % of Net GMVSpot Prices Used
$2,419,920,00075.4%Diamond $315.00/ct
Project Resource Estimate - Ekati - Core - Misery
May 24, 2013NI 43-101Mats Heimersson PEng, Jon Carlson, P.GeoCutoff: 1.0 mm
Note: Carat values as of Dec 31, 2012 assuming 1.2 mm process plant cutoff, resource at 1.0 mm cutoff, recoveries reflect adjustment to 1.2 mm plant.
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources3,700,000$504/tDiamond450.0 cpht88.0%16,650,000 ct100%
Inferred Mineral Resources800,000$325/tDiamond290.0 cpht88.0%2,320,000 ct100%
All Categories Spot4,500,000$472/tDiamond421.6 cpht
18,970,000 ct100%
Spot Gross Metal ValueMarket Cap as % of Net GMVSpot Prices Used
$2,124,640,00085.9%Diamond $112.00/ct
Project Resource Estimate - Ekati - Core - Pigeon
May 24, 2013NI 43-101Mats Heimersson PEng, Jon Carlson, P.GeoCutoff: 1.0 mm
Note: Carat values as of Dec 31, 2012 assuming 1.2 mm process plant cutoff, resource at 1.0 mm cutoff, recoveries reflect adjustment to 1.2 mm plant. Pigeon RVK $217/ct 88%, MK $195/ct 83%.
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources10,600,000$103/tDiamond50.0 cpht88.0%5,300,000 ct100%
All Categories Spot10,600,000$103/tDiamond50.0 cpht
5,300,000 ct100%
Spot Gross Metal ValueMarket Cap as % of Net GMVSpot Prices Used
$1,091,800,000167.1%Diamond $206.00/ct
Project Resource Estimate - Ekati - Core - Sable
May 24, 2013NI 43-101Mats Heimersson PEng, Jon Carlson, P.GeoCutoff: 1.0 mm
Note: Carat values as of Dec 31, 2012 assuming 1.2 mm process plant cutoff, resource at 1.0 mm cutoff, recoveries reflect adjustment to 1.2 mm plant.
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources15,400,000$126/tDiamond90.0 cpht79.0%13,860,000 ct100%
All Categories Spot15,400,000$126/tDiamond90.0 cpht
13,860,000 ct100%
Spot Gross Metal ValueMarket Cap as % of Net GMVSpot Prices Used
$1,940,400,00094.0%Diamond $140.00/ct

Diavik Project
DiavikCanadaNTLac de Gras241,628 ha
Net Interest: 40% WI
Vested: Yes
Uncapped NSR/GOR: 0.00%
Ownership Terms: Sold 22.5% of 40% to Kinross on Mar 19, 2009 for US $104.4 million to reduce Harry Winston to 31% and net 9% to Kinross. On July 23 a deal was reached to buy back the 22.5% interest for US$50 million, 7.1 million shares and a $100 million one year promissory note.
Target Metals: DiamondModel: KimberliteStage: 9-Production
Implied Project ValueJK Dream Target$100 million$500 million$2 billionSpeculative Value
$3,648,401,236$2,000,000,000

Ekati - Buffer Project
Ekati - BufferCanadaNTCentral Slave89,151 ha
Net Interest: 58.8% WI
Vested: Yes
Uncapped NSR/GOR: 0.00%
Ownership Terms: Acquried April 10, 2013 from BHP Billiton as part of Ekati acquisition at US $553 million. Archon Minerals Ltd owns 31.2% and C Fipke Holdings Ltd 10%.
Target Metals: DiamondModel: KimberliteStage: 7-Permitting & Feasibility
Implied Project ValueJK Dream Target$100 million$500 million$2 billionSpeculative Value
$2,481,905,603Not Rated
Base Case Resource Estimates
Project Resource Estimate - Ekati - Buffer - Jay
May 24, 2013NI 43-101Mats Heimersson PEng, Jon Carlson, P.GeoCutoff: 1.0 mm
Note: Carat values as of Dec 31, 2012 assuming 1.2 mm process plant cutoff, resource at 1.0 mm cutoff, recoveries reflect adjustment to 1.2 mm plant.
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources36,200,000n/aDiamond220.0 cpht85.0%79,640,000 ctn/a
Inferred Mineral Resources9,500,000n/aDiamond140.0 cpht85.0%13,300,000 ctn/a
All Categories Spot45,700,000n/aDiamond203.4 cpht
92,940,000 ctn/a
Project Resource Estimate - Ekati - Buffer - Lynx
May 24, 2013NI 43-101Mats Heimersson PEng, Jon Carlson, P.GeoCutoff: 1.0 mm
Note: Carat values as of Dec 31, 2012 assuming 1.2 mm process plant cutoff, resource at 1.0 mm cutoff, recoveries reflect adjustment to 1.2 mm plant.
Resource CategoryTonnageTotal
Rock Value
MetalGradeRecoveryContained Metal% of GMV
Indicated Resources1,300,000n/aDiamond80.0 cpht86.0%1,040,000 ctn/a
Inferred Mineral Resources100,000n/aDiamond80.0 cpht86.0%80,000 ctn/a
All Categories Spot1,400,000n/aDiamond80.0 cpht
1,120,000 ctn/a
Company Related KRO Comments
Aug 28, 2013Spec Value Hunter Comment: Recommendation Strategy for Peregrine Diamonds Ltd
Jan 14, 2013Index Member Comment: Harry Winston to remake itself as a pure diamond producer
Aug 4, 2010Spec Value Hunter Comment: Mountain Province feasibility study for Gahcho Kue on track for end of August
Sep 18, 2009Spec Value Hunter Comment: Takeover rumour sends Mountain Province stock flying
Sep 18, 2009Spec Value Hunter Comment: Harry Winston cancels plan for winter mining shutdown at Diavik
Jun 1, 2009Tracker 2009-04: A breakthrough for Mountain Province's Gahcho Kue appears imminent
Mar 19, 2009Diamond Comment: Harry Winston sells 9% net interest in Diavik to Kinross
Jan 18, 2006Express 2006-01: Peregrine Diamonds set to trade on January 18, 2006
Jun 20, 2005Express 2005-10: Tli Kwi Cho pipe reinstated as a world class diamond mine contender
Dec 31, 2004Profile Synopsis: Aber Diamond Corp

Company News Releases
May 25, 2016Fiscal 2017 First Quarter Sales and Ekati Production Results
May 25, 2016Fiscal 2017 First Quarter Results To Be Released Wednesday, June 8, 2016
May 20, 2016Reports Approval Of Jay Project Environmental Assessment
Apr 18, 2016Reports Diavik Diamond Mine First Calendar Quarter Production
Apr 13, 2016Fiscal 2016 Fourth Quarter Positive Free Cash Flow In a Challenging Diamond Market
Apr 13, 2016Appointment of New Chairman
Mar 23, 2016Fiscal 2016 Fourth Quarter and Year End Results to be Released Wednesday, April 13, 2016
Mar 8, 2016Updated Reserve and Resource Statement For the Diavik Diamond Mine
Feb 23, 2016Fiscal 2016 Fourth Quarter and Year End Sales; Ekati Diamond Mine Production Results, Ekati Fiscal 2017 Mine Plan and Jay Pipe Update
Feb 22, 2016Sable Project Pre Feasibility Study Results
Feb 22, 2016Appointment of New Director
Feb 2, 2016MVEIRB's Recommendation for Approval of Jay Project
Jan 18, 2016Diavik Diamond Mine Fourth Calendar Quarter Production
Jan 13, 2016Appointment Of New Directors And New Chairman Designate
Dec 24, 2015Director Resignations
Dec 23, 2015Comments On Media Speculation
Dec 22, 2015Statement in Response to the Schedule 13D Filed
Dec 10, 2015Fiscal 2016 Third Quarter Results
Nov 24, 2015Fiscal 2016 Third Quarter Results to be released Thursday, December 10, 2015
Nov 19, 2015Fiscal 2016 Third Quarter Sales and Production Results
Nov 6, 2015CEO Brendan Bell Appointed to Board of Directors
Oct 16, 2015Diavik Diamond Mine Third Calendar Quarter Production
Sep 10, 2015Fiscal 2016 Second Quarter Results
Sep 10, 2015Sable Project Preliminary Economic Assessment Results
Aug 25, 2015Fiscal 2016 Second Quarter Results to be released Thursday, September 10, 2015
Aug 20, 2015Fiscal 2016 Second Quarter Sales and Production Results
Jul 16, 2015Diavik Diamond Mine Second Calendar Quarter Production
Jul 15, 2015Election of Directors
Jul 13, 2015Chairman Robert A. Gannicott to Resume Duties and Brendan Bell Appointed CEO
Jun 11, 2015Fiscal 2016 First Quarter Results
May 26, 2015Fiscal 2016 First Quarter Results to be Released Wednesday, June 10, 2015
May 21, 2015Fiscal 2015 First Quarter Sales and Production Results
Apr 20, 2015Files Annual Report on Form 40 F with SEC
Apr 9, 2015Continued Strong Operating Results Supporting Dividend Declaration
Mar 25, 2015Files Technical Report for the Diavik Diamond Mine
Mar 25, 2015Fiscal 2015 Fourth Quarter and Year End Results to be Released Wednesday, April 8, 2015
Mar 23, 2015Sandstorm Gold Acquires Royalty on Diavik Diamond Mine
Mar 13, 2015Files Technical Report for the Ekati Diamond Mine
Mar 6, 2015Issues Updated Reserves and Resources Statement For the Diavik Diamond Mine
Feb 24, 2015Fiscal 2015 Fourth Quarter and Year End Sales and Production Results
Jan 27, 2015Jay Project Pre Feasibility Study Results
Jan 19, 2015Diavik Diamond Mine Fourth Calendar Quarter Production
Dec 12, 2014PART 3 OF 3: Fiscal 2015 Third Quarter Results
Dec 12, 2014PART 2 OF 3: Fiscal 2015 Third Quarter Results
Dec 12, 2014PART 1 OF 3: Fiscal 2015 Third Quarter Results
Nov 26, 2014Approval for the A 21 Pipe at Diavik
Nov 26, 2014Fiscal 2015 Third Quarter Results to be Released Dec. 11, 2014
Nov 20, 2014Third Quarter Fiscal 2015 Sales and Production Results
Nov 20, 2014Chairman And CEO Takes Medical Leave
Nov 7, 2014Provides Financial Security for the Ekati Diamond Mine
Nov 7, 2014Files Developer's Assessment Report for the Ekati Diamond Mine
Oct 15, 2014Increases Interest in the Ekati Diamond Mine
Oct 15, 2014Diavik Diamond Mine Third Calendar Quarter Production
Oct 2, 2014OSC Re Dominion Diamond Corp
Sep 3, 2014(3/3) Fiscal 2015 Second Quarter Results
Sep 3, 2014(2/3) Fiscal 2015 Second Quarter Results
Sep 3, 2014(1/3) Fiscal 2015 Second Quarter Results
Aug 20, 2014Fiscal 2015 Second Quarter Results to be released Wednesday, September 3, 2014
Aug 19, 2014Second Quarter Fiscal 2015 Sales and Production Results and Appointment of Chief Financial Officer
Jul 21, 2014Updated Mine Plan for the Ekati Diamond Mine
Jul 16, 2014Election of Directors
Jul 16, 2014Diavik Diamond Mine Second Calendar Quarter Production 3 76 -
Jul 9, 2014To Increase Interest in the Ekati Diamond Mine
Jun 11, 2014Fiscal 2015 First Quarter Results
May 27, 2014Fiscal 2015 First Quarter Results to be released Wednesday, June 11, 2014
May 20, 2014First Quarter 2015 Sales and Production Update
Apr 21, 2014Files Annual Report on Form 40 F with SEC
Apr 15, 2014Diavik Diamond Mine First Calendar Quarter Production
Apr 3, 2014Fiscal 2014 Fourth Quarter and Year End Results
Mar 19, 2014Fiscal 2014 Fourth Quarter and Year End Results to be released Wednesday, April 2, 2014
Mar 14, 2014Updated Reserve And Resource Statements For The Ekati And Diavik Diamond Mines
Feb 3, 2014Issues Updated Mine Plans for the Ekati and Diavik Diamond Mines
Jan 16, 2014Diavik and Ekati Diamond Mine Fourth Calendar Quarter Production
Dec 10, 2013(3/3)Fiscal 2014 Third Quarter Results
Dec 10, 2013(2/3)Fiscal 2014 Third Quarter Results
Dec 10, 2013(1/3)Fiscal 2014 Third Quarter Results
Nov 26, 2013Fiscal 2014 Third Quarter Results to be Released Tuesday, December 10, 2013
Oct 23, 2013Files Application to Extend the Ekati Diamond Mine
Oct 15, 2013Diavik and Ekati Diamond Mine Third Calendar Quarter Production
Oct 3, 2013Updates Lac De Gras Diamond Project, Nwt
Sep 16, 2013Files Lynx Pipe Project Description Report
Sep 5, 2013Part 4 Of 4: Fiscal 2014 Second Quarter Results
Sep 5, 2013Part 3 Of 4: Fiscal 2014 Second Quarter Results
Sep 5, 2013Part 2 Of 4: Fiscal 2014 Second Quarter Results
Sep 5, 2013PART 1 OF 4: Fiscal 2014 Second Quarter Results


 

You can return to the Top of this page


Copyright © 2017 Kaiser Research Online, All Rights Reserved